Photo of plans (nice to see in print vs. online):
The STREET name! Poppylane Terrace:
Lots of excavating right now, pushing as fast as possible to get done before the rains. PGE, NW Natural, etc.- plus the road and the wells will all be done *hopefully* before winter:
Trenches all through property, preparing for installation:
The road 9/11/2021: